Assessment of BIM-Facility Management for the Potentialization of Sports Infrastructure. Case study

This study assesses the application of the BIM-FM methodology as a tool for managing, analyzing, and optimizing existing sports infrastructure. The Olympic Pool “El Batán” in Quito, Ecuador, was selected as a case study due to its age—over 40 years—and lack of updated technical documentation. A BIM...

Fuld beskrivelse

Saved in:
Bibliografiske detaljer
Hovedforfatter: Maldonado-García, Alex (author)
Andre forfattere: Alvansazyazdi, Mohammadfarid (author)
Format: article
Sprog:eng
Udgivet: 2026
Fag:
Online adgang:https://revistadigital.uce.edu.ec/index.php/INGENIO/article/view/8950
Tags: Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!