Instalación de una planta purificadora de agua en Atacames

The present work aims to provide a guide for the installation of a purifying and bottling plant of water. It describes from the design and distribution of the plant, the costs and processes of production up to the aspects to be taken into consideration from the installation and the production like s...

Full description

Saved in:
Bibliographic Details
Main Author: Ortiz Real, Fernando Xavier (author)
Format: bachelorThesis
Language:spa
Published: 2009
Subjects:
Online Access:http://dspace.udla.edu.ec/handle/33000/856
Tags: Add Tag
No Tags, Be the first to tag this record!