Estudio de tiempos y movimientos para el proceso de producción de hidróxido de calcio en la empresa PROCALSACOM – Riobamba
This research project was carried out at PROCALSACOM, a company that was experiencing problems with low productivity, lack of control, and a lack of standardization in its production process. Given this situation, the objective was to optimize calcium hydroxide production by applying a time and moti...
Uloženo v:
| Hlavní autor: | |
|---|---|
| Médium: | bachelorThesis |
| Jazyk: | spa |
| Vydáno: |
2026
|
| Témata: | |
| On-line přístup: | http://dspace.unach.edu.ec/handle/51000/16578 |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|