“EFECTO DEL LAST PLANNER SYSTEM EN LA PRODUCTIVIDAD TOTAL DE LOS FACTORES EN PROYECTOS DE OBRAS VIALES”

The Last Planner System or System is a tool of Lean construction for the management of projects that allows to plan and control the work flow to optimize resources. On the other hand the Total Productivity of the Factors (PTF) is an indicator that is used in processes where several productive factor...

Fuld beskrivelse

Saved in:
Bibliografiske detaljer
Hovedforfatter: Parra Guzmán, Dennis Santiago (author)
Format: bachelorThesis
Sprog:spa
Udgivet: 2019
Fag:
Online adgang:http://dspace.unach.edu.ec/handle/51000/5431
Tags: Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!