“EFECTO DEL LAST PLANNER SYSTEM EN LA PRODUCTIVIDAD TOTAL DE LOS FACTORES EN PROYECTOS DE OBRAS VIALES”

The Last Planner System or System is a tool of Lean construction for the management of projects that allows to plan and control the work flow to optimize resources. On the other hand the Total Productivity of the Factors (PTF) is an indicator that is used in processes where several productive factor...

Full description

Saved in:
Bibliographic Details
Main Author: Parra Guzmán, Dennis Santiago (author)
Format: bachelorThesis
Language:spa
Published: 2019
Subjects:
Online Access:http://dspace.unach.edu.ec/handle/51000/5431
Tags: Add Tag
No Tags, Be the first to tag this record!