Causas del bajo nivel de uso de la metodología BIM, sujeto de estudio 23 proyectos privados del Ecuador
The BIM methodology globally controls projects in the construction industry so that errors can be reduced, collaborative work facilitated, and productivity improved in the project life cycle. Through studies carried out in Ecuador, the authors have determined a low level of use of this methodology w...
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | bachelorThesis |
| Language: | spa |
| Published: |
2022
|
| Subjects: | |
| Online Access: | http://dspace.unach.edu.ec/handle/51000/9147 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|