Causas del bajo nivel de uso de la metodología BIM, sujeto de estudio 23 proyectos privados del Ecuador

The BIM methodology globally controls projects in the construction industry so that errors can be reduced, collaborative work facilitated, and productivity improved in the project life cycle. Through studies carried out in Ecuador, the authors have determined a low level of use of this methodology w...

Ful tanımlama

Kaydedildi:
Detaylı Bibliyografya
Yazar: Claudio Espinel, Yadira Estefany (author)
Diğer Yazarlar: Salazar Ocaña, Reychelt Mariana (author)
Materyal Türü: bachelorThesis
Dil:spa
Baskı/Yayın Bilgisi: 2022
Konular:
Online Erişim:http://dspace.unach.edu.ec/handle/51000/9147
Etiketler: Etiketle
Etiket eklenmemiş, İlk siz ekleyin!