Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo

ECUAGESA S.A. is a company dedicated to the operation of the Topo hydroelectric plant, this hydroelectric plant is a pass-through plant, so, it captures part of the flow of the Topo River to conduct it through its main structures. In this researching project, the description of the study facilities...

Full description

Saved in:
Bibliographic Details
Main Author: Alvarado Macas, Isabel Anahí (author)
Format: bachelorThesis
Language:spa
Published: 2022
Subjects:
Online Access:http://dspace.unach.edu.ec/handle/51000/10156
Tags: Add Tag
No Tags, Be the first to tag this record!