Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo
ECUAGESA S.A. is a company dedicated to the operation of the Topo hydroelectric plant, this hydroelectric plant is a pass-through plant, so, it captures part of the flow of the Topo River to conduct it through its main structures. In this researching project, the description of the study facilities...
Saved in:
| Main Author: | |
|---|---|
| Format: | bachelorThesis |
| Language: | spa |
| Published: |
2022
|
| Subjects: | |
| Online Access: | http://dspace.unach.edu.ec/handle/51000/10156 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|