Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo

ECUAGESA S.A. is a company dedicated to the operation of the Topo hydroelectric plant, this hydroelectric plant is a pass-through plant, so, it captures part of the flow of the Topo River to conduct it through its main structures. In this researching project, the description of the study facilities...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Alvarado Macas, Isabel Anahí (author)
Format: bachelorThesis
Sprache:spa
Veröffentlicht: 2022
Schlagworte:
Online Zugang:http://dspace.unach.edu.ec/handle/51000/10156
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
_version_ 1859016487924137984
author Alvarado Macas, Isabel Anahí
author_facet Alvarado Macas, Isabel Anahí
author_role author
collection Repositorio Universidad Nacional de Chimborazo
dc.contributor.none.fl_str_mv López Telenchana, Luis Stalin
dc.creator.none.fl_str_mv Alvarado Macas, Isabel Anahí
dc.date.none.fl_str_mv 2022-12-12T21:09:23Z
2022-12-12T21:09:23Z
2022-12-12
dc.format.none.fl_str_mv 183 páginas
dc.identifier.none.fl_str_mv UNACH- FI-IIND
http://dspace.unach.edu.ec/handle/51000/10156
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Riobamba, Universidad Nacional de Chimborazo
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Nacional de Chimborazo
instname:Universidad Nacional de Chimborazo
instacron:UNACH
dc.subject.none.fl_str_mv Problemas operativos
Ishikawa
dc.title.none.fl_str_mv Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description ECUAGESA S.A. is a company dedicated to the operation of the Topo hydroelectric plant, this hydroelectric plant is a pass-through plant, so, it captures part of the flow of the Topo River to conduct it through its main structures. In this researching project, the description of the study facilities was made with the information that the company has, to then identify the dangers so that the operational risks are identified, this with the help of the Ishikawa tool with the following parameters; human error, generation systems, environment and material. Subsequently, through the construction of an operational risk matrix, the INSHT methodology being a guide and taking into account criticality analysis and MEIPEE methodology for its assessment, the critical situations and elements that directly affect the production processes were established, to raise the plans. of action necessary for each of them, in order to reduce the response time to possible contingencies. In addition, the infrastructure, resources, spare parts, equipment and logistics systems of the plant were analyzed, in order to form the support administration, in which the functions that each of the members that make up this group will have will be described. The design of the developed contingency plan will serve as a tool capable of anticipating, solving and reducing response times in the presence of the various operational risk factors, which are the causes for stopping energy production.
eu_rights_str_mv openAccess
format bachelorThesis
id UNACH_759f7ea8fa364eb6299fbceb010a4ac8
identifier_str_mv UNACH- FI-IIND
instacron_str UNACH
institution UNACH
instname_str Universidad Nacional de Chimborazo
language spa
network_acronym_str UNACH
network_name_str Repositorio Universidad Nacional de Chimborazo
oai_identifier_str oai:localhost:51000/10156
publishDate 2022
publisher.none.fl_str_mv Riobamba, Universidad Nacional de Chimborazo
reponame_str Repositorio Universidad Nacional de Chimborazo
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Nacional de Chimborazo - Universidad Nacional de Chimborazo
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica TopoAlvarado Macas, Isabel AnahíProblemas operativosIshikawaECUAGESA S.A. is a company dedicated to the operation of the Topo hydroelectric plant, this hydroelectric plant is a pass-through plant, so, it captures part of the flow of the Topo River to conduct it through its main structures. In this researching project, the description of the study facilities was made with the information that the company has, to then identify the dangers so that the operational risks are identified, this with the help of the Ishikawa tool with the following parameters; human error, generation systems, environment and material. Subsequently, through the construction of an operational risk matrix, the INSHT methodology being a guide and taking into account criticality analysis and MEIPEE methodology for its assessment, the critical situations and elements that directly affect the production processes were established, to raise the plans. of action necessary for each of them, in order to reduce the response time to possible contingencies. In addition, the infrastructure, resources, spare parts, equipment and logistics systems of the plant were analyzed, in order to form the support administration, in which the functions that each of the members that make up this group will have will be described. The design of the developed contingency plan will serve as a tool capable of anticipating, solving and reducing response times in the presence of the various operational risk factors, which are the causes for stopping energy production.ECUAGESA S.A. es una empresa dedicada al funcionamiento de la central hidroeléctrica Topo, central de paso, es decir capta parte del caudal del rio Topo para conducirla a través de sus estructuras principales. En el presente proyecto investigativo se realizó la descripción de las instalaciones de estudio con la información que cuenta la empresa, para luego identificar los peligros para que se de los riesgos operativos, esto con ayuda de la herramienta Ishikawa con los siguientes parámetros; error humano, sistemas de generación, ambiente y material. Posteriormente mediante la construcción de una matriz de riegos operativos siendo una guía la metodología INSST y tomando en cuenta para su valoración análisis de criticidad y metodología MEIPEE, las amenazas que afectan directamente a los procesos de producción, para levantar los planes de acción necesarios para cada uno de ellos, con el fin de reducir el tiempo de repuesta ante las posibles contingencias. Además, se analizó la infraestructura, los recursos, repuestos, equipos y sistemas logísticos de la central, para de esta manera conformar la administración de apoyo, en el cual se describirán las funciones que tendrá cada uno de los miembros que integran este grupo. El diseño del plan de contingencia desarrollado servirá como una herramienta capaz de anticipar, solventar y reducir tiempos de respuesta ante la presencia de los diversos factores de riesgos operativos, que son las causas para detener la producción de energía.UNACH, EcuadorRiobamba, Universidad Nacional de ChimborazoLópez Telenchana, Luis Stalin2022-12-12T21:09:23Z2022-12-12T21:09:23Z2022-12-12info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis183 páginasUNACH- FI-IINDhttp://dspace.unach.edu.ec/handle/51000/10156spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Nacional de Chimborazoinstname:Universidad Nacional de Chimborazoinstacron:UNACH2023-02-04T08:11:41Zoai:localhost:51000/10156Institucionalhttp://dspace.unach.edu.ec/Universidad públicahttps://www.unach.edu.ec/http://dspace.unach.edu.ec/oai.Ecuador...opendoar:02023-02-04T08:11:41Repositorio Universidad Nacional de Chimborazo - Universidad Nacional de Chimborazofalse
spellingShingle Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo
Alvarado Macas, Isabel Anahí
Problemas operativos
Ishikawa
status_str publishedVersion
title Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo
title_full Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo
title_fullStr Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo
title_full_unstemmed Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo
title_short Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo
title_sort Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo
topic Problemas operativos
Ishikawa
url http://dspace.unach.edu.ec/handle/51000/10156