Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo

ECUAGESA S.A. is a company dedicated to the operation of the Topo hydroelectric plant, this hydroelectric plant is a pass-through plant, so, it captures part of the flow of the Topo River to conduct it through its main structures. In this researching project, the description of the study facilities...

Full beskrivning

Sparad:
Bibliografiska uppgifter
Huvudupphovsman: Alvarado Macas, Isabel Anahí (author)
Materialtyp: bachelorThesis
Språk:spa
Publicerad: 2022
Ämnen:
Länkar:http://dspace.unach.edu.ec/handle/51000/10156
Taggar: Lägg till en tagg
Inga taggar, Lägg till första taggen!