Diseño de un plan de contingencia técnica y operativa para los departamentos de operación y mantenimiento de la central hidroeléctrica Topo

ECUAGESA S.A. is a company dedicated to the operation of the Topo hydroelectric plant, this hydroelectric plant is a pass-through plant, so, it captures part of the flow of the Topo River to conduct it through its main structures. In this researching project, the description of the study facilities...

全面介紹

Saved in:
書目詳細資料
主要作者: Alvarado Macas, Isabel Anahí (author)
格式: bachelorThesis
語言:spa
出版: 2022
主題:
在線閱讀:http://dspace.unach.edu.ec/handle/51000/10156
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!

相似書籍