Estudio de procesos, tiempos y movimientos para mejorar la productividad en la planta de ensamble del modelo Golden en carrocerías Megabuss.

The company "Carrocerías Megabuss" of Riobamba city, it has among its facilities with the assemblage plant model Golden, which is responsible for assembling the elements, built on the ground of parts and components, and also builds and makes assembly of those elements that are conducted un...

Descripción completa

Guardado en:
Detalles Bibliográficos
Autor principal: Yuqui Casco, José Antonio (author)
Formato: bachelorThesis
Lenguaje:spa
Publicado: 2016
Materias:
Acceso en línea:http://dspace.unach.edu.ec/handle/51000/3130
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!
_version_ 1840628083348996096
author Yuqui Casco, José Antonio
author_facet Yuqui Casco, José Antonio
author_role author
collection Repositorio Universidad Nacional de Chimborazo
dc.contributor.none.fl_str_mv Cabezas, Edmundo
dc.creator.none.fl_str_mv Yuqui Casco, José Antonio
dc.date.none.fl_str_mv 2016-10-19T16:16:26Z
2016-10-19T16:16:26Z
2016
dc.format.none.fl_str_mv 172 p.
dc.identifier.none.fl_str_mv ING-IND
http://dspace.unach.edu.ec/handle/51000/3130
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Riobamba: Universidad Nacional de Chimborazo, 2016.
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Nacional de Chimborazo
instname:Universidad Nacional de Chimborazo
instacron:UNACH
dc.subject.none.fl_str_mv Ingeniería de métodos
Procesos
Tiempos actuales
Movimientos
dc.title.none.fl_str_mv Estudio de procesos, tiempos y movimientos para mejorar la productividad en la planta de ensamble del modelo Golden en carrocerías Megabuss.
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/bachelorThesis
description The company "Carrocerías Megabuss" of Riobamba city, it has among its facilities with the assemblage plant model Golden, which is responsible for assembling the elements, built on the ground of parts and components, and also builds and makes assembly of those elements that are conducted under its responsibility. This does not have standards of time and motion, this tool lets regulate and organize production for each section of the productive process. That’s why there is a need for a study of processes, time and movement, in order to improve the productivity in the assembly plant model Golden. The support is based on the theories of the study of processes, times and movements; the research is addressed according to the type of application descriptive study with a study design field. The population was 44 workers who developed their activities within the plant, who manipulated the machinery, equipment, transportation and manufacturing the product. It was necessary to perform a diagnostic in order to understand and analyze the work of production staff at the assemblage plant; the process’ diagram of operation distribution and travel plant was formed; in addition three measurements of time of each activity is performed to increase the reliability of the results, and recorded in conditions time study, immediately processing and data analysis was performed and the results obtained, concluded that there is unproductive work time and rework, delaying production time and therefore affects productivity. The work was justified by drawing up a proposal for improvement, based on the results obtained, also has a technical reference for when another production line increases.
eu_rights_str_mv openAccess
format bachelorThesis
id UNACH_8ba32e17a38a6c50dea46ae65d4a53e6
identifier_str_mv ING-IND
instacron_str UNACH
institution UNACH
instname_str Universidad Nacional de Chimborazo
language spa
network_acronym_str UNACH
network_name_str Repositorio Universidad Nacional de Chimborazo
oai_identifier_str oai:localhost:51000/3130
publishDate 2016
publisher.none.fl_str_mv Riobamba: Universidad Nacional de Chimborazo, 2016.
reponame_str Repositorio Universidad Nacional de Chimborazo
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Nacional de Chimborazo - Universidad Nacional de Chimborazo
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Estudio de procesos, tiempos y movimientos para mejorar la productividad en la planta de ensamble del modelo Golden en carrocerías Megabuss.Yuqui Casco, José AntonioIngeniería de métodosProcesosTiempos actualesMovimientosThe company "Carrocerías Megabuss" of Riobamba city, it has among its facilities with the assemblage plant model Golden, which is responsible for assembling the elements, built on the ground of parts and components, and also builds and makes assembly of those elements that are conducted under its responsibility. This does not have standards of time and motion, this tool lets regulate and organize production for each section of the productive process. That’s why there is a need for a study of processes, time and movement, in order to improve the productivity in the assembly plant model Golden. The support is based on the theories of the study of processes, times and movements; the research is addressed according to the type of application descriptive study with a study design field. The population was 44 workers who developed their activities within the plant, who manipulated the machinery, equipment, transportation and manufacturing the product. It was necessary to perform a diagnostic in order to understand and analyze the work of production staff at the assemblage plant; the process’ diagram of operation distribution and travel plant was formed; in addition three measurements of time of each activity is performed to increase the reliability of the results, and recorded in conditions time study, immediately processing and data analysis was performed and the results obtained, concluded that there is unproductive work time and rework, delaying production time and therefore affects productivity. The work was justified by drawing up a proposal for improvement, based on the results obtained, also has a technical reference for when another production line increases.La empresa “Carrocerías Megabuss”, de la ciudad de Riobamba, cuenta entre sus instalaciones con la planta de ensamble del modelo Golden, la cual se encarga de ensamblar los elementos construidos en la planta de piezas y partes, así también construir y realizar el montaje de aquellos elementos que se elaboran bajo su responsabilidad. Esta no cuenta con estándares de tiempos y movimientos, herramienta que permite normalizar y organizar la producción para cada una de las secciones del proceso productivo. Es por eso que surge la necesidad de realizar un estudio de procesos, tiempos y movimientos, con el fin de mejorar la productividad en la planta de ensamble del modelo Golden. El sustento se basa en las teorías sobre el estudio de procesos, tiempos y movimientos, la investigación se aborda de acuerdo al tipo de estudio descriptivo-aplicativo, con un diseño de estudio de campo. La población fue de 44 trabajadores que desarrollaron sus actividades dentro de la planta, quienes manipularon las máquinas, equipos, transporte y manufactura del producto. Fue necesario ejecutar un diagnóstico con el fin de conocer y analizar las labores del personal de producción en la planta de ensamble; luego se formó los diagramas de operaciones de proceso, de distribución de planta y de recorrido; además se realizó tres mediciones de los tiempos de cada actividad, para incrementar la confiabilidad de los resultados, y se registró en las matrices de estudio de tiempos, inmediatamente se efectuó el procesamiento y análisis de los datos y se obtuvo los resultados, concluyéndose que existe tiempos improductivos y retrabajo, que retrasa el tiempo de producción y por ende afecta la productividad. El trabajo se justificó mediante la elaboración de una propuesta de mejoras, en función de los resultados obtenidos, también se tiene un referente técnico para cuando se incremente otra línea de producción.UNACH, Sede Ecuador.Riobamba: Universidad Nacional de Chimborazo, 2016.Cabezas, Edmundo2016-10-19T16:16:26Z2016-10-19T16:16:26Z2016info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/bachelorThesis172 p.ING-INDhttp://dspace.unach.edu.ec/handle/51000/3130spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Nacional de Chimborazoinstname:Universidad Nacional de Chimborazoinstacron:UNACH2016-10-20T08:01:10Zoai:localhost:51000/3130Institucionalhttp://dspace.unach.edu.ec/Universidad públicahttps://www.unach.edu.ec/http://dspace.unach.edu.ec/oai.Ecuador...opendoar:02016-10-20T08:01:10Repositorio Universidad Nacional de Chimborazo - Universidad Nacional de Chimborazofalse
spellingShingle Estudio de procesos, tiempos y movimientos para mejorar la productividad en la planta de ensamble del modelo Golden en carrocerías Megabuss.
Yuqui Casco, José Antonio
Ingeniería de métodos
Procesos
Tiempos actuales
Movimientos
status_str publishedVersion
title Estudio de procesos, tiempos y movimientos para mejorar la productividad en la planta de ensamble del modelo Golden en carrocerías Megabuss.
title_full Estudio de procesos, tiempos y movimientos para mejorar la productividad en la planta de ensamble del modelo Golden en carrocerías Megabuss.
title_fullStr Estudio de procesos, tiempos y movimientos para mejorar la productividad en la planta de ensamble del modelo Golden en carrocerías Megabuss.
title_full_unstemmed Estudio de procesos, tiempos y movimientos para mejorar la productividad en la planta de ensamble del modelo Golden en carrocerías Megabuss.
title_short Estudio de procesos, tiempos y movimientos para mejorar la productividad en la planta de ensamble del modelo Golden en carrocerías Megabuss.
title_sort Estudio de procesos, tiempos y movimientos para mejorar la productividad en la planta de ensamble del modelo Golden en carrocerías Megabuss.
topic Ingeniería de métodos
Procesos
Tiempos actuales
Movimientos
url http://dspace.unach.edu.ec/handle/51000/3130