Diseño e Implementación de una pico-central hidroeléctrica aplicada al centro de control de la captación de agua potable de UMAPAL en el sector Shucos.
In this project listed the different stages in which was developed the design and implementation of a pico-central hydroelectric plant in the Shucos sector to supply electric power to the center of control of water catchment for the UMAPAL of Loja. The first stage is to determine the demand for ener...
Spremljeno u:
| Glavni autor: | |
|---|---|
| Daljnji autori: | |
| Format: | bachelorThesis |
| Jezik: | spa |
| Izdano: |
2013
|
| Teme: | |
| Online pristup: | http://dspace.unl.edu.ec/jspui/handle/123456789/12082 |
| Oznake: |
Dodaj oznaku
Bez oznaka, Budi prvi tko označuje ovaj zapis!
|