Diseño y construcción de un banco de pruebas para analizar los métodos de ajuste de máximo rendimiento de una bomba hidráulica instalada a una red de operación.
This research work deals with the theme "Design and construction of a test bed to analyze the adjustment methods most from a hydraulic pump installed to a network in operation" in Chapter I begins with the analysis of one of the problems that affects the students learning AEIRNNR, Electrom...
Sábháilte in:
| Príomhchruthaitheoir: | |
|---|---|
| Rannpháirtithe: | |
| Formáid: | bachelorThesis |
| Teanga: | spa |
| Foilsithe / Cruthaithe: |
2012
|
| Ábhair: | |
| Rochtain ar líne: | http://dspace.unl.edu.ec/jspui/handle/123456789/12342 |
| Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|