“Estudio Geológico - Geotécnico del Crucero principal Gaby, para la construcción de la Chimenea de Ventilación 240 desde el nivel 1210 hacia la superficie, en la concesión minera Narcisa Sarango, Código: 690680”.

The Narcisa mine establishes its production operations since 2013, through the subway mining system, using the method of chambers and pillars with a variant of "Sublevel Stoping" and by upward cut and fill; it is located in the southwestern part of the parish La Victoria, belonging to the...

Cijeli opis

Spremljeno u:
Bibliografski detalji
Glavni autor: Cabrera Alvarado, Javier Alexander (author)
Format: bachelorThesis
Jezik:spa
Izdano: 2024
Teme:
Online pristup:https://dspace.unl.edu.ec/jspui/handle/123456789/29691
Oznake: Dodaj oznaku
Bez oznaka, Budi prvi tko označuje ovaj zapis!