Estudio de la calidad de energía eléctrica en el Centro de carga meladura y en el transformador de 50 kVA, situados en las instalaciones del Ingenio Azucarero Monterrey MALCA .

The present project has as general objective to analyze the parameters linked with the Quality of the Electric power in the load center Meladura and in the Transformer of 50 kVA, located in the facilities of the Sugar Genius Monterrey MALCA, being necessary to elaborate a proposal of improvement of...

Full description

Saved in:
Bibliographic Details
Main Author: Quevedo Celi, Luis Adrián (author)
Format: bachelorThesis
Language:spa
Published: 2007
Subjects:
Online Access:http://dspace.unl.edu.ec/jspui/handle/123456789/16679
Tags: Add Tag
No Tags, Be the first to tag this record!