Metodología para la construcción de acometidas e instalación de medidores digitales.
This pilot study aims to present the general guidelines for installing digital meters underground or overhead type connections. The Southern Regional Electricity Company (EERSSA) we have single phase measurement systems, two phase or three phase, the type of meter to be installed will depend on thei...
Saved in:
| 主要作者: | |
|---|---|
| 格式: | bachelorThesis |
| 語言: | spa |
| 出版: |
2015
|
| 主題: | |
| 在線閱讀: | http://dspace.unl.edu.ec/jspui/handle/123456789/18150 |
| 標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|