Diseño de las obras de derivación del proyecto Río Sur 2
The current titling project responds to an energy demand. The design of the derivation works of the RIO SUR 2 project was elaborated at the feasibility level; It includes the following hydraulic works: the lateral catch with a small dam of 4m high with built-in discharge, a catchment dump that satis...
Na minha lista:
| Autor principal: | |
|---|---|
| Formato: | bachelorThesis |
| Idioma: | spa |
| Publicado em: |
2017
|
| Assuntos: | |
| Acesso em linha: | http://dspace.ups.edu.ec/handle/123456789/14413 |
| Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|