Diseño de las obras de derivación del proyecto Río Sur 2

The current titling project responds to an energy demand. The design of the derivation works of the RIO SUR 2 project was elaborated at the feasibility level; It includes the following hydraulic works: the lateral catch with a small dam of 4m high with built-in discharge, a catchment dump that satis...

Descrición completa

Gardado en:
Detalles Bibliográficos
Autor Principal: Olalla Remache, Mercy Aydee (author)
Formato: bachelorThesis
Idioma:spa
Publicado: 2017
Subjects:
Acceso en liña:http://dspace.ups.edu.ec/handle/123456789/14413
Tags: Engadir etiqueta
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!