Factibilidad para la implementación de un sistema subterráneo de transmisión de energía eléctrica mediante un sistema cross-bonding
This paper presents a complete overview of the feasibility of implementing a system of underground power transmission through a Cross-Bonding system as a suitable alternative for a project of this nature where the main objective is to connect two oil fields in the country them that are under the res...
Saved in:
| Main Author: | |
|---|---|
| Format: | bachelorThesis |
| Language: | spa |
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://dspace.ups.edu.ec/handle/123456789/8056 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|