Factibilidad para la implementación de un sistema subterráneo de transmisión de energía eléctrica mediante un sistema cross-bonding
This paper presents a complete overview of the feasibility of implementing a system of underground power transmission through a Cross-Bonding system as a suitable alternative for a project of this nature where the main objective is to connect two oil fields in the country them that are under the res...
Furkejuvvon:
| Váldodahkki: | |
|---|---|
| Materiálatiipa: | bachelorThesis |
| Giella: | spa |
| Almmustuhtton: |
2015
|
| Fáttát: | |
| Liŋkkat: | http://dspace.ups.edu.ec/handle/123456789/8056 |
| Fáddágilkorat: |
Lasit fáddágilkoriid
Eai fáddágilkorat, Lasit vuosttaš fáddágilkora!
|
| Čoahkkáigeassu: | This paper presents a complete overview of the feasibility of implementing a system of underground power transmission through a Cross-Bonding system as a suitable alternative for a project of this nature where the main objective is to connect two oil fields in the country them that are under the responsibility of the principal state enterprise. Petroamazonas EP is responsible for responsible and proper exploitation of natural resources of oil, and under your goal should develop and empower oil blocks and this is where the simple fact of the location and geographic diversity of these camps tended hinders air mains and enters the Cross-Bonding system, which by its transpose setting screens can eliminate losses as a result of voltages induced in them and the product of these power losses arise economic losses in the system. |
|---|