Factibilidad para la implementación de un sistema subterráneo de transmisión de energía eléctrica mediante un sistema cross-bonding
This paper presents a complete overview of the feasibility of implementing a system of underground power transmission through a Cross-Bonding system as a suitable alternative for a project of this nature where the main objective is to connect two oil fields in the country them that are under the res...
Salvato in:
| Autore principale: | López Andrango, Edison Fabricio (author) |
|---|---|
| Natura: | bachelorThesis |
| Lingua: | spa |
| Pubblicazione: |
2015
|
| Soggetti: | |
| Accesso online: | http://dspace.ups.edu.ec/handle/123456789/8056 |
| Tags: |
Nessun Tag, puoi essere il primo ad aggiungerne!!
|
Documenti analoghi
Documenti analoghi
-
Despliegue óptimo de sincronofasores en un sistema de transmisión eléctrica
di: Paida Tenemaza, Carlos Eduardo
Pubblicazione: (2015) -
Óptimo despliegue de sincronofasores en un sistema de distribución eléctrica
di: Haro Vaca, Jefferson Ricardo
Pubblicazione: (2015) -
Impacto de la generación embebida en la operación de las redes de distribución eléctrica
di: Carchi Arcentales, Luis Martín
Pubblicazione: (2004) -
Ubicación de un sistema de compensación reactiva en la red de transmisión de energía eléctrica basado en programación no lineal entera mixta considerando cargabilidad de la red
di: Guzmán Rodríguez, Gonzalo Fabricio
Pubblicazione: (2020) -
Impacto de la integración de generación eléctrica no convencional al sistema de transmisión de energía
di: Estrella Nieto, Christian Fernando
Pubblicazione: (2022)