Diseño de las obras de embalse del proyecto hidroeléctrico Machinaza

The present project includes a set of civil works that allow to take advantage of the flow of the Machinaza river, 18.4 km downstream of its crossing with the Zamora river, so that the demand of the energy user is satisfied with 95% guarantee in volume and time. The main structures, designed at the...

Descripció completa

Guardat en:
Dades bibliogràfiques
Autor principal: Valdivieso Carrión, Vanessa Lizeth (author)
Format: bachelorThesis
Idioma:spa
Publicat: 2017
Matèries:
Accés en línia:http://dspace.ups.edu.ec/handle/123456789/14411
Etiquetes: Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!