Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.

An electrical system that does not have a coordination study of electrical protections can be affected and may not guarantee a correct operation. For this reason, in this research project, the coordination of the overcurrent electrical protections of the S/E Sarapullo - PHTP was overcurrent electric...

Deskribapen osoa

Gorde:
Xehetasun bibliografikoak
Egile nagusia: Caizapanta Tapia, Freddy Estalin (author)
Beste egile batzuk: Caizapanta Tapia, Jefferson Alejandro (author)
Formatua: masterThesis
Hizkuntza:spa
Argitaratua: 2022
Gaiak:
Sarrera elektronikoa:http://repositorio.utc.edu.ec/handle/27000/9798