Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.

An electrical system that does not have a coordination study of electrical protections can be affected and may not guarantee a correct operation. For this reason, in this research project, the coordination of the overcurrent electrical protections of the S/E Sarapullo - PHTP was overcurrent electric...

詳細記述

保存先:
書誌詳細
第一著者: Caizapanta Tapia, Freddy Estalin (author)
その他の著者: Caizapanta Tapia, Jefferson Alejandro (author)
フォーマット: masterThesis
言語:spa
出版事項: 2022
主題:
オンライン・アクセス:http://repositorio.utc.edu.ec/handle/27000/9798
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
_version_ 1863503498251862016
author Caizapanta Tapia, Freddy Estalin
author2 Caizapanta Tapia, Jefferson Alejandro
author2_role author
author_facet Caizapanta Tapia, Freddy Estalin
Caizapanta Tapia, Jefferson Alejandro
author_role author
collection Repositorio Universidad Técnica de Cotopaxi
dc.contributor.none.fl_str_mv Proaño Maldonado, Xavier Alfonso
dc.creator.none.fl_str_mv Caizapanta Tapia, Freddy Estalin
Caizapanta Tapia, Jefferson Alejandro
dc.date.none.fl_str_mv 2022
2023-03-09T16:40:34Z
2023-03-09T16:40:34Z
dc.format.none.fl_str_mv 139 páginas
application/pdf
dc.identifier.none.fl_str_mv Caizapanta Tapia Freddy Estalin, Caizapanta Tapia Jefferson Alejandro (2022); Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón. UTC. Latacunga. 139 p.
MUTC-001339
http://repositorio.utc.edu.ec/handle/27000/9798
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Ecuador: Latacunga: Universidad Técnica de Cotopaxi (UTC)
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Técnica de Cotopaxi
instname:Universidad Técnica de Cotopaxi
instacron:UTC
dc.subject.none.fl_str_mv COORDINACIÓN
SUBESTACIÓN
SOBRECORRIENTE
FALLA TRIFÁSICA
ELECTRICIDAD
dc.title.none.fl_str_mv Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/masterThesis
description An electrical system that does not have a coordination study of electrical protections can be affected and may not guarantee a correct operation. For this reason, in this research project, the coordination of the overcurrent electrical protections of the S/E Sarapullo - PHTP was overcurrent electrical protections of the S/E Sarapullo - PHTP, which is in the provinces of located between the provinces of Pichincha, Santo Domingo de los Tsáchilas and Cotopaxi. The Sarapullo Substation receives generation through RIP bars, a power of 3 hydro generators of 16.15 [MW] each at 13.8kV level from the Sarapullo Power House, the Sarapullo Powerhouse will also deliver power to the La Palma S/E and to a switchyard where there is a transformer switchyard where there is a 13.8/230 kV step-up transformer to deliver power to a 230 kV L/T, that will reach the Alluriquín substation where it will be connected to the Santa Rosa and Santo Domingo lines of the National Interconnected System (SNI). The electrical characteristics of the system were considered at the electrical characteristics of the system were considered as a starting point for modeling and coordinating the modeling and coordination of the electrical protections of the Sarapullo substation. calculation of short circuit current, the IEC 60909 standard was applied. Using the information provided by the client, we obtained the network equivalent upstream of the Sarapullo substation for the Sarapullo substation to focus the research topic without leaving aside all the parameters of the parameters that make up the Toachi Pilatón Hydroelectric Project and the SNI. The Sarapullo S/E works at 13.8/230 kV levels for which the nominal current at which it will be operating was obtained. A nominal current at which the relays will be operating was obtained. Relays, 20% more than the nominal current was considered for the adjustment of the protection relays. The coordination of the electrical protections considered maximum, and minimum short-circuit currents for, and minimum short-circuit currents for single-phase and three-phase faults. The relays used in the project are numerical relays RED670, REL650, RET670, and REF615. discrimination time between curves was 250ms with a tolerance of +/- 50ms. Most of the IEC Inverse curves were mostly used for single-phase and three-phase fault settings for the three-phase faults; for power transformer protection, bidirectional protections were used. bidirectional protections were used for power transformer protection.
eu_rights_str_mv openAccess
format masterThesis
id UTC_19c4be4b6fd88d8653abc9a37eea5e9d
identifier_str_mv Caizapanta Tapia Freddy Estalin, Caizapanta Tapia Jefferson Alejandro (2022); Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón. UTC. Latacunga. 139 p.
MUTC-001339
instacron_str UTC
institution UTC
instname_str Universidad Técnica de Cotopaxi
language spa
network_acronym_str UTC
network_name_str Repositorio Universidad Técnica de Cotopaxi
oai_identifier_str oai:repositorio.utc.edu.ec:27000/9798
publishDate 2022
publisher.none.fl_str_mv Ecuador: Latacunga: Universidad Técnica de Cotopaxi (UTC)
reponame_str Repositorio Universidad Técnica de Cotopaxi
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.Caizapanta Tapia, Freddy EstalinCaizapanta Tapia, Jefferson AlejandroCOORDINACIÓNSUBESTACIÓNSOBRECORRIENTEFALLA TRIFÁSICAELECTRICIDADAn electrical system that does not have a coordination study of electrical protections can be affected and may not guarantee a correct operation. For this reason, in this research project, the coordination of the overcurrent electrical protections of the S/E Sarapullo - PHTP was overcurrent electrical protections of the S/E Sarapullo - PHTP, which is in the provinces of located between the provinces of Pichincha, Santo Domingo de los Tsáchilas and Cotopaxi. The Sarapullo Substation receives generation through RIP bars, a power of 3 hydro generators of 16.15 [MW] each at 13.8kV level from the Sarapullo Power House, the Sarapullo Powerhouse will also deliver power to the La Palma S/E and to a switchyard where there is a transformer switchyard where there is a 13.8/230 kV step-up transformer to deliver power to a 230 kV L/T, that will reach the Alluriquín substation where it will be connected to the Santa Rosa and Santo Domingo lines of the National Interconnected System (SNI). The electrical characteristics of the system were considered at the electrical characteristics of the system were considered as a starting point for modeling and coordinating the modeling and coordination of the electrical protections of the Sarapullo substation. calculation of short circuit current, the IEC 60909 standard was applied. Using the information provided by the client, we obtained the network equivalent upstream of the Sarapullo substation for the Sarapullo substation to focus the research topic without leaving aside all the parameters of the parameters that make up the Toachi Pilatón Hydroelectric Project and the SNI. The Sarapullo S/E works at 13.8/230 kV levels for which the nominal current at which it will be operating was obtained. A nominal current at which the relays will be operating was obtained. Relays, 20% more than the nominal current was considered for the adjustment of the protection relays. The coordination of the electrical protections considered maximum, and minimum short-circuit currents for, and minimum short-circuit currents for single-phase and three-phase faults. The relays used in the project are numerical relays RED670, REL650, RET670, and REF615. discrimination time between curves was 250ms with a tolerance of +/- 50ms. Most of the IEC Inverse curves were mostly used for single-phase and three-phase fault settings for the three-phase faults; for power transformer protection, bidirectional protections were used. bidirectional protections were used for power transformer protection.Un sistema eléctrico que no cuente con un estudio de coordinación de protecciones eléctricas puede verse afectado y no garantizar un correcto funcionamiento, por tal razón en el proyecto de investigación se obtuvo la coordinación de las protecciones eléctricas de sobrecorriente de la S/E Sarapullo - PHTP, la cual se encuentra localizada entre las provincias de Pichincha, Santo Domingo de los Tsáchilas y Cotopaxi. La Subestación Sarapullo recibe la generación por medio de barras RIP, una potencia de 3 hidro generadores de 16,15 [MW] cada uno a nivel 13.8kV desde Casa de Máquinas Sarapullo, también entregara energía a la S/E La Palma y a un patio de maniobras donde existe un transformador elevador de 13.8/230 kV para entregar a una L/T de 230 kV que llegará a la S/E Alluriquín donde se conectara a las líneas Santa Rosa y Santo Domingo del Sistema Nacional Interconectado (SNI). Se consideraron las características eléctricas del sistema como punto de partida para la modelación y coordinación de las protecciones eléctricas de la S/E Sarapullo, para el cálculo de corriente de corto circuito se aplicó la norma IEC 60909. Utilizando la información entregada por el cliente, obtenemos el equivalente de red aguas arriba de la subestación Sarapullo para focalizar el tema de investigación sin dejar de lado todos los parámetros que conforman el Proyecto Hidroeléctrico Toachi Pilatón y el SNI. La S/E Sarapullo trabaja a niveles de 13.8/230 kV para los cuales se obtuvo la corriente nominal en el que se encontrará operando los relés, para el ajuste de los relés de protección se consideró un 20% más de la corriente nominal. En la coordinación de las protecciones eléctricas se consideró corrientes de corto circuito máximas y mínimas para fallas monofásicas y trifásicas. Los relés empleados en el proyecto son numéricos RED670, REL650, RET670 y REF615, el margen de tiempo de discriminación entre curvas fue de 250 ms con una tolerancia de +/- 50ms. En su mayoría se utilizaron curvas IEC Inverse para el ajuste de fallas monofásicas y trifásicas, para la protección del transformador de potencia se usó protecciones bidireccionales. Se cumple con la hipótesis planteada y se entregan los resultados para que sean implementados en S/E Sarapullo previo a la puesta en servicio.Ecuador: Latacunga: Universidad Técnica de Cotopaxi (UTC)Proaño Maldonado, Xavier Alfonso2023-03-09T16:40:34Z2023-03-09T16:40:34Z2022info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis139 páginasapplication/pdfCaizapanta Tapia Freddy Estalin, Caizapanta Tapia Jefferson Alejandro (2022); Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón. UTC. Latacunga. 139 p.MUTC-001339http://repositorio.utc.edu.ec/handle/27000/9798spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2023-03-10T08:01:20Zoai:repositorio.utc.edu.ec:27000/9798Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02026-04-26T03:41:43.455792Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue
spellingShingle Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.
Caizapanta Tapia, Freddy Estalin
COORDINACIÓN
SUBESTACIÓN
SOBRECORRIENTE
FALLA TRIFÁSICA
ELECTRICIDAD
status_str publishedVersion
title Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.
title_full Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.
title_fullStr Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.
title_full_unstemmed Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.
title_short Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.
title_sort Calibración de las Protecciones Eléctricas de la Subestación Sarapullo del Proyecto Hidroeléctrico Toachi – Pilatón.
topic COORDINACIÓN
SUBESTACIÓN
SOBRECORRIENTE
FALLA TRIFÁSICA
ELECTRICIDAD
url http://repositorio.utc.edu.ec/handle/27000/9798