Determinación de procedimientos para la localización de fallas en redes eléctricas soterradas de medio voltaje utilizando el sistema Megger Centrix 2.0 de la Empresa Eléctrica Quito.
Every electric power distribution company that has medium voltage underground networks is exposed to a failure in any part of it, which is why implementing new technologies with their respective procedures is essential to ensure its reliability and quality of service. In this project, the procedures...
Wedi'i Gadw mewn:
| Prif Awdur: | |
|---|---|
| Fformat: | bachelorThesis |
| Iaith: | spa |
| Cyhoeddwyd: |
2021
|
| Pynciau: | |
| Mynediad Ar-lein: | http://repositorio.utc.edu.ec/handle/27000/7959 |
| Tagiau: |
Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!
|