Análisis de fallos de máquinas y equipos, para el diseño de un plan de mantenimiento preventivo en la empresa construcciones metálicas Albán de la ciudad de Latacunga.

The bugs’ analysis of machines and equipment for the design of a preventive maintenance plan in the enterprise metal buildings Alban of the Latacunga city, we offer us a help to create an order in the activities, which bring as result the strengthening from economic beings giving us an agility in fi...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Glavni avtor: Oña Chiliquinga, Jose Vicente (author)
Format: bachelorThesis
Jezik:spa
Izdano: 2013
Teme:
Online dostop:http://repositorio.utc.edu.ec/handle/27000/5190
Oznake: Označite
Brez oznak, prvi označite!