Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015

This research work describes the study of electrical charge to size the electrical system in the plantation Kallary Corporation, located in the province of Napo Tena industry in 2015. The most appropriate place of the interconnected system passing through Tena to project power Line Company with the...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autor: Achote Andy, Edison Nicolay (author)
Médium: bachelorThesis
Jazyk:spa
Vydáno: 2015
Témata:
On-line přístup:http://repositorio.utc.edu.ec/handle/27000/3599
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
Popis
Shrnutí:This research work describes the study of electrical charge to size the electrical system in the plantation Kallary Corporation, located in the province of Napo Tena industry in 2015. The most appropriate place of the interconnected system passing through Tena to project power Line Company with the help of the simulator and the computer application SISDE geographic location "Global Mapper" connection is defined. Besides the analysis of the medium voltage network (with the data obtained from the run power flow) it was conducted to determine if the selected power transformer can respond to the power demand of the plant. In this study we used the simulator Neplan.