Estudio de carga eléctrica para dimensionar el sistema eléctrico en la plantación de la corporación kallary, ubicada en la provincia de Napo sector Tena, en el año 2015

This research work describes the study of electrical charge to size the electrical system in the plantation Kallary Corporation, located in the province of Napo Tena industry in 2015. The most appropriate place of the interconnected system passing through Tena to project power Line Company with the...

全面介紹

Saved in:
書目詳細資料
主要作者: Achote Andy, Edison Nicolay (author)
格式: bachelorThesis
語言:spa
出版: 2015
主題:
在線閱讀:http://repositorio.utc.edu.ec/handle/27000/3599
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:This research work describes the study of electrical charge to size the electrical system in the plantation Kallary Corporation, located in the province of Napo Tena industry in 2015. The most appropriate place of the interconnected system passing through Tena to project power Line Company with the help of the simulator and the computer application SISDE geographic location "Global Mapper" connection is defined. Besides the analysis of the medium voltage network (with the data obtained from the run power flow) it was conducted to determine if the selected power transformer can respond to the power demand of the plant. In this study we used the simulator Neplan.