Elaboración de un plan de mantenimiento preventivo para el tren de laminación de productos pequeños (LPP) de la empresa NOVACERO S.A. Planta Lasso.
In NOVACERO S.A Company Lasso plant, currently it consists of two lines to manufacture profiles. “El Tren dos” which previously produced all the hot rolled profiles manufactured in its Lasso plant and el tren LPP (Laminate of small products), which replaced it in 2012 in the production of short prof...
Gardado en:
| Autor Principal: | |
|---|---|
| Outros autores: | |
| Formato: | bachelorThesis |
| Idioma: | spa |
| Publicado: |
2018
|
| Subjects: | |
| Acceso en liña: | http://repositorio.utc.edu.ec/handle/27000/5561 |
| Tags: |
Engadir etiqueta
Sen Etiquetas, Sexa o primeiro en etiquetar este rexistro!
|