Propuesta de estandarización para el área de elpo de la planta de pintura en la empresa CIAUTO.

The main aim of this research work was to standardize the productive processes of the ELPO area, through a study of times. A standard time was considered for each operation, verifying inappropriate delays that do not add value but are part of the process. The proposed study was proposed as an explor...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Quinaucho Ocapana, Edison Andrés (author)
Weitere Verfasser: Unapucha Quintuña, Ángel Omar (author)
Format: bachelorThesis
Sprache:spa
Veröffentlicht: 2019
Schlagworte:
Online Zugang:http://repositorio.utc.edu.ec/handle/27000/5610
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!