Manufactura y evaluación de una bomba de ariete multipulsor boxer con dos vías de carga horizontal.

The purpose of this work was the construction of a conventional ram pump, taking as a reference the design proposed by the colleagues (Karen Tituana and Rodrigo Jiménez), and after it was built, validate the operating parameters and the performance evaluation through simulation and experimentation....

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Autor principal: Edison Fernando, Llano Toapanta (author)
Outros Autores: Richard Paúl, Oña Velasco (author)
Formato: bachelorThesis
Idioma:spa
Publicado em: 2021
Assuntos:
Acesso em linha:http://repositorio.utc.edu.ec/handle/27000/8104
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!