Propuesta de estandarización para el área de elpo de la planta de pintura en la empresa CIAUTO.

The main aim of this research work was to standardize the productive processes of the ELPO area, through a study of times. A standard time was considered for each operation, verifying inappropriate delays that do not add value but are part of the process. The proposed study was proposed as an explor...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autor: Quinaucho Ocapana, Edison Andrés (author)
Další autoři: Unapucha Quintuña, Ángel Omar (author)
Médium: bachelorThesis
Jazyk:spa
Vydáno: 2019
Témata:
On-line přístup:http://repositorio.utc.edu.ec/handle/27000/5610
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!