Análisis de fallos de máquinas y equipos, para el diseño de un plan de mantenimiento preventivo en la empresa construcciones metálicas Albán de la ciudad de Latacunga.

The bugs’ analysis of machines and equipment for the design of a preventive maintenance plan in the enterprise metal buildings Alban of the Latacunga city, we offer us a help to create an order in the activities, which bring as result the strengthening from economic beings giving us an agility in fi...

全面介绍

Saved in:
书目详细资料
主要作者: Oña Chiliquinga, Jose Vicente (author)
格式: bachelorThesis
语言:spa
出版: 2013
主题:
在线阅读:http://repositorio.utc.edu.ec/handle/27000/5190
标签: 添加标签
没有标签, 成为第一个标记此记录!