Análisis de fallos de máquinas y equipos, para el diseño de un plan de mantenimiento preventivo en la empresa construcciones metálicas Albán de la ciudad de Latacunga.
The bugs’ analysis of machines and equipment for the design of a preventive maintenance plan in the enterprise metal buildings Alban of the Latacunga city, we offer us a help to create an order in the activities, which bring as result the strengthening from economic beings giving us an agility in fi...
Saved in:
主要作者: | |
---|---|
格式: | bachelorThesis |
语言: | spa |
出版: |
2013
|
主题: | |
在线阅读: | http://repositorio.utc.edu.ec/handle/27000/5190 |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|