Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.

The company EP Petroecuador in block 7 Oso B has a 13.6 MW electricity generation plant since 2015, in charge of generating energy for the Oso B and Oso I locations; and due to failures or mismatches in the electrical protections during its operation, they cause economic losses for the company. The...

Full description

Saved in:
Bibliographic Details
Main Author: Chasiloa Chiluisa, Diego Xavier (author)
Format: masterThesis
Language:spa
Published: 2023
Subjects:
Online Access:http://repositorio.utc.edu.ec/handle/27000/10444
Tags: Add Tag
No Tags, Be the first to tag this record!