Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.

The company EP Petroecuador in block 7 Oso B has a 13.6 MW electricity generation plant since 2015, in charge of generating energy for the Oso B and Oso I locations; and due to failures or mismatches in the electrical protections during its operation, they cause economic losses for the company. The...

Полное описание

Сохранить в:
Библиографические подробности
Главный автор: Chasiloa Chiluisa, Diego Xavier (author)
Формат: masterThesis
Язык:spa
Опубликовано: 2023
Предметы:
Online-ссылка:http://repositorio.utc.edu.ec/handle/27000/10444
Метки: Добавить метку
Нет меток, Требуется 1-ая метка записи!
_version_ 1822282059313315840
author Chasiloa Chiluisa, Diego Xavier
author_facet Chasiloa Chiluisa, Diego Xavier
author_role author
collection Repositorio Universidad Técnica de Cotopaxi
dc.contributor.none.fl_str_mv Proaño Maldonado, Xavier Alfonso
dc.creator.none.fl_str_mv Chasiloa Chiluisa, Diego Xavier
dc.date.none.fl_str_mv 2023-06-20T21:13:23Z
2023-06-20T21:13:23Z
2023
dc.format.none.fl_str_mv 138 páginas
dc.identifier.none.fl_str_mv Diego Xavier Chasiloa Chiluisa (2023); Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. UTC. Latacunga 138 p.
MUTC-001512
http://repositorio.utc.edu.ec/handle/27000/10444
dc.language.none.fl_str_mv spa
dc.publisher.none.fl_str_mv Ecuador : Latacunga: Universidad Técnica de Cotopaxi (UTC)
dc.rights.none.fl_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:Repositorio Universidad Técnica de Cotopaxi
instname:Universidad Técnica de Cotopaxi
instacron:UTC
dc.subject.none.fl_str_mv GENERADORES
PROTECCIONES
BREAKER
RELÉS
ELECTRICIDAD
dc.title.none.fl_str_mv Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.
dc.type.none.fl_str_mv info:eu-repo/semantics/publishedVersion
info:eu-repo/semantics/masterThesis
description The company EP Petroecuador in block 7 Oso B has a 13.6 MW electricity generation plant since 2015, in charge of generating energy for the Oso B and Oso I locations; and due to failures or mismatches in the electrical protections during its operation, they cause economic losses for the company. The purpose of this work is to collect information and evaluate the adjustments of the electrical protections at the level of 4.16 and 13.8 kV of the generation plant, and through a modeling of the electrical system in the ETAP 20.0 software, it was simulated: flows power, short circuits and equipment failures to obtain the different relay coordination curves.
eu_rights_str_mv openAccess
format masterThesis
id UTC_bdc753ded134cb3db376d5bd5f961f4b
identifier_str_mv Diego Xavier Chasiloa Chiluisa (2023); Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. UTC. Latacunga 138 p.
MUTC-001512
instacron_str UTC
institution UTC
instname_str Universidad Técnica de Cotopaxi
language spa
network_acronym_str UTC
network_name_str Repositorio Universidad Técnica de Cotopaxi
oai_identifier_str oai:oai:repositorio.utc.edu.ec:27000:27000/10444
publishDate 2023
publisher.none.fl_str_mv Ecuador : Latacunga: Universidad Técnica de Cotopaxi (UTC)
reponame_str Repositorio Universidad Técnica de Cotopaxi
repository.mail.fl_str_mv .
repository.name.fl_str_mv Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi
repository_id_str 0
rights_invalid_str_mv http://creativecommons.org/licenses/by-nc-sa/3.0/ec/
spelling Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.Chasiloa Chiluisa, Diego XavierGENERADORESPROTECCIONESBREAKERRELÉSELECTRICIDADThe company EP Petroecuador in block 7 Oso B has a 13.6 MW electricity generation plant since 2015, in charge of generating energy for the Oso B and Oso I locations; and due to failures or mismatches in the electrical protections during its operation, they cause economic losses for the company. The purpose of this work is to collect information and evaluate the adjustments of the electrical protections at the level of 4.16 and 13.8 kV of the generation plant, and through a modeling of the electrical system in the ETAP 20.0 software, it was simulated: flows power, short circuits and equipment failures to obtain the different relay coordination curves.La empresa EP Petroecuador en el bloque 7 Oso B dispone de una planta de generación eléctrica de 13,6 MW desde el año 2015, encargada de generar energía para las locaciones Oso B y Oso I; y debido a fallas o desajustes en las protecciones eléctricas durante su funcionamiento, provocan pérdidas económicas para la empresa. El presente trabajo tiene como propósito recopilar información y evaluar los ajustes de las protecciones eléctricas a nivel de 4,16 y 13,8 kV de la planta de generación, y mediante un modelado del sistema eléctrico en el software ETAP 20.0, se simuló: flujos de potencia, cortocircuitos y fallas en los equipos para obtener las diferentes curvas de coordinación de relés.Ecuador : Latacunga: Universidad Técnica de Cotopaxi (UTC)Proaño Maldonado, Xavier Alfonso2023-06-20T21:13:23Z2023-06-20T21:13:23Z2023info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis138 páginasDiego Xavier Chasiloa Chiluisa (2023); Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. UTC. Latacunga 138 p.MUTC-001512http://repositorio.utc.edu.ec/handle/27000/10444spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2023-06-21T08:01:17Zoai:oai:repositorio.utc.edu.ec:27000:27000/10444Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02025-01-26T03:45:46.072407Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue
spellingShingle Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.
Chasiloa Chiluisa, Diego Xavier
GENERADORES
PROTECCIONES
BREAKER
RELÉS
ELECTRICIDAD
status_str publishedVersion
title Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.
title_full Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.
title_fullStr Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.
title_full_unstemmed Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.
title_short Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.
title_sort Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.
topic GENERADORES
PROTECCIONES
BREAKER
RELÉS
ELECTRICIDAD
url http://repositorio.utc.edu.ec/handle/27000/10444