Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.
The company EP Petroecuador in block 7 Oso B has a 13.6 MW electricity generation plant since 2015, in charge of generating energy for the Oso B and Oso I locations; and due to failures or mismatches in the electrical protections during its operation, they cause economic losses for the company. The...
Сохранить в:
| Главный автор: | |
|---|---|
| Формат: | masterThesis |
| Язык: | spa |
| Опубликовано: |
2023
|
| Предметы: | |
| Online-ссылка: | http://repositorio.utc.edu.ec/handle/27000/10444 |
| Метки: |
Добавить метку
Нет меток, Требуется 1-ая метка записи!
|
| _version_ | 1822282059313315840 |
|---|---|
| author | Chasiloa Chiluisa, Diego Xavier |
| author_facet | Chasiloa Chiluisa, Diego Xavier |
| author_role | author |
| collection | Repositorio Universidad Técnica de Cotopaxi |
| dc.contributor.none.fl_str_mv | Proaño Maldonado, Xavier Alfonso |
| dc.creator.none.fl_str_mv | Chasiloa Chiluisa, Diego Xavier |
| dc.date.none.fl_str_mv | 2023-06-20T21:13:23Z 2023-06-20T21:13:23Z 2023 |
| dc.format.none.fl_str_mv | 138 páginas |
| dc.identifier.none.fl_str_mv | Diego Xavier Chasiloa Chiluisa (2023); Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. UTC. Latacunga 138 p. MUTC-001512 http://repositorio.utc.edu.ec/handle/27000/10444 |
| dc.language.none.fl_str_mv | spa |
| dc.publisher.none.fl_str_mv | Ecuador : Latacunga: Universidad Técnica de Cotopaxi (UTC) |
| dc.rights.none.fl_str_mv | http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ info:eu-repo/semantics/openAccess |
| dc.source.none.fl_str_mv | reponame:Repositorio Universidad Técnica de Cotopaxi instname:Universidad Técnica de Cotopaxi instacron:UTC |
| dc.subject.none.fl_str_mv | GENERADORES PROTECCIONES BREAKER RELÉS ELECTRICIDAD |
| dc.title.none.fl_str_mv | Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. |
| dc.type.none.fl_str_mv | info:eu-repo/semantics/publishedVersion info:eu-repo/semantics/masterThesis |
| description | The company EP Petroecuador in block 7 Oso B has a 13.6 MW electricity generation plant since 2015, in charge of generating energy for the Oso B and Oso I locations; and due to failures or mismatches in the electrical protections during its operation, they cause economic losses for the company. The purpose of this work is to collect information and evaluate the adjustments of the electrical protections at the level of 4.16 and 13.8 kV of the generation plant, and through a modeling of the electrical system in the ETAP 20.0 software, it was simulated: flows power, short circuits and equipment failures to obtain the different relay coordination curves. |
| eu_rights_str_mv | openAccess |
| format | masterThesis |
| id | UTC_bdc753ded134cb3db376d5bd5f961f4b |
| identifier_str_mv | Diego Xavier Chasiloa Chiluisa (2023); Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. UTC. Latacunga 138 p. MUTC-001512 |
| instacron_str | UTC |
| institution | UTC |
| instname_str | Universidad Técnica de Cotopaxi |
| language | spa |
| network_acronym_str | UTC |
| network_name_str | Repositorio Universidad Técnica de Cotopaxi |
| oai_identifier_str | oai:oai:repositorio.utc.edu.ec:27000:27000/10444 |
| publishDate | 2023 |
| publisher.none.fl_str_mv | Ecuador : Latacunga: Universidad Técnica de Cotopaxi (UTC) |
| reponame_str | Repositorio Universidad Técnica de Cotopaxi |
| repository.mail.fl_str_mv | . |
| repository.name.fl_str_mv | Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxi |
| repository_id_str | 0 |
| rights_invalid_str_mv | http://creativecommons.org/licenses/by-nc-sa/3.0/ec/ |
| spelling | Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7.Chasiloa Chiluisa, Diego XavierGENERADORESPROTECCIONESBREAKERRELÉSELECTRICIDADThe company EP Petroecuador in block 7 Oso B has a 13.6 MW electricity generation plant since 2015, in charge of generating energy for the Oso B and Oso I locations; and due to failures or mismatches in the electrical protections during its operation, they cause economic losses for the company. The purpose of this work is to collect information and evaluate the adjustments of the electrical protections at the level of 4.16 and 13.8 kV of the generation plant, and through a modeling of the electrical system in the ETAP 20.0 software, it was simulated: flows power, short circuits and equipment failures to obtain the different relay coordination curves.La empresa EP Petroecuador en el bloque 7 Oso B dispone de una planta de generación eléctrica de 13,6 MW desde el año 2015, encargada de generar energía para las locaciones Oso B y Oso I; y debido a fallas o desajustes en las protecciones eléctricas durante su funcionamiento, provocan pérdidas económicas para la empresa. El presente trabajo tiene como propósito recopilar información y evaluar los ajustes de las protecciones eléctricas a nivel de 4,16 y 13,8 kV de la planta de generación, y mediante un modelado del sistema eléctrico en el software ETAP 20.0, se simuló: flujos de potencia, cortocircuitos y fallas en los equipos para obtener las diferentes curvas de coordinación de relés.Ecuador : Latacunga: Universidad Técnica de Cotopaxi (UTC)Proaño Maldonado, Xavier Alfonso2023-06-20T21:13:23Z2023-06-20T21:13:23Z2023info:eu-repo/semantics/publishedVersioninfo:eu-repo/semantics/masterThesis138 páginasDiego Xavier Chasiloa Chiluisa (2023); Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. UTC. Latacunga 138 p.MUTC-001512http://repositorio.utc.edu.ec/handle/27000/10444spahttp://creativecommons.org/licenses/by-nc-sa/3.0/ec/info:eu-repo/semantics/openAccessreponame:Repositorio Universidad Técnica de Cotopaxiinstname:Universidad Técnica de Cotopaxiinstacron:UTC2023-06-21T08:01:17Zoai:oai:repositorio.utc.edu.ec:27000:27000/10444Institucionalhttp://repositorio.utc.edu.ec/Universidad públicahttps://www.utc.edu.ec/..Ecuador...opendoar:02025-01-26T03:45:46.072407Repositorio Universidad Técnica de Cotopaxi - Universidad Técnica de Cotopaxitrue |
| spellingShingle | Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. Chasiloa Chiluisa, Diego Xavier GENERADORES PROTECCIONES BREAKER RELÉS ELECTRICIDAD |
| status_str | publishedVersion |
| title | Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. |
| title_full | Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. |
| title_fullStr | Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. |
| title_full_unstemmed | Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. |
| title_short | Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. |
| title_sort | Análisis de los ajustes de protecciones a nivel de 4,16 y 13,8 kv de la planta de generación Hyundai oso b de la Empresa EP Petroecuador bloque 7. |
| topic | GENERADORES PROTECCIONES BREAKER RELÉS ELECTRICIDAD |
| url | http://repositorio.utc.edu.ec/handle/27000/10444 |