Análisis de la demanda eléctrica actual para la ampliación del sistema eléctrico en la planta procesadora de alimentos Genim S.A. del cantón Latacunga en el año 2017.
This research project aimed to carry out the analysis of the electrical system of the company Genim S.A .; The same one that has had an unplanned growth of the electrical demand, which is manifested in an unknown loadability of the current transformer, which has generated problems in the quality of...
Kaydedildi:
| Yazar: | |
|---|---|
| Diğer Yazarlar: | |
| Materyal Türü: | bachelorThesis |
| Dil: | spa |
| Baskı/Yayın Bilgisi: |
2017
|
| Konular: | |
| Online Erişim: | http://repositorio.utc.edu.ec/handle/27000/4470 |
| Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|