Estudio y mejora de la eficiencia de generación eléctrica del grupo No. 3 de la Central Hidroeléctrica Illuchi 1 .

The Hydroelectric Power Plant called "Illuchi 1" of Empresa Eléctrica Provincial Cotopaxi S.A (ELEPCO SA), is made up of four turbines that drive 4 sets of generators, of which No. 1 and 2 have the capacity to generate 872 kVA, being its actual exploited power of 600 kW; Meanwhile groups N...

Disgrifiad llawn

Wedi'i Gadw mewn:
Manylion Llyfryddiaeth
Prif Awdur: Espinel Cepeda, Carlos Alfredo (author)
Awduron Eraill: Iza Iza, Johanna Estefanía (author)
Fformat: masterThesis
Iaith:spa
Cyhoeddwyd: 2022
Pynciau:
Mynediad Ar-lein:http://repositorio.utc.edu.ec/handle/27000/8377
Tagiau: Ychwanegu Tag
Dim Tagiau, Byddwch y cyntaf i dagio'r cofnod hwn!