Estudio de tiempos y movimientos en la elaboración de suelas para calzado en la empresa Preplast.

The present research project aims to perform a study of times and movements in the injection molding process to increase the production levels of soles for footwear in the "PREPLAST" company; in that company there is no previous study to determine standard production times, unproductive ti...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Glavni avtor: Llumitasig Tipantuña, Olger Germánico (author)
Drugi avtorji: Paredes Caiza, Jaime Enrique (author)
Format: bachelorThesis
Jezik:spa
Izdano: 2019
Teme:
Online dostop:http://repositorio.utc.edu.ec/handle/27000/5433
Oznake: Označite
Brez oznak, prvi označite!