Estudio de tiempos y movimientos en la elaboración de suelas para calzado en la empresa Preplast.
The present research project aims to perform a study of times and movements in the injection molding process to increase the production levels of soles for footwear in the "PREPLAST" company; in that company there is no previous study to determine standard production times, unproductive ti...
Shranjeno v:
| Glavni avtor: | |
|---|---|
| Drugi avtorji: | |
| Format: | bachelorThesis |
| Jezik: | spa |
| Izdano: |
2019
|
| Teme: | |
| Online dostop: | http://repositorio.utc.edu.ec/handle/27000/5433 |
| Oznake: |
Označite
Brez oznak, prvi označite!
|