Estudio y mejora de la eficiencia de generación eléctrica del grupo No. 3 de la Central Hidroeléctrica Illuchi 1 .
The Hydroelectric Power Plant called "Illuchi 1" of Empresa Eléctrica Provincial Cotopaxi S.A (ELEPCO SA), is made up of four turbines that drive 4 sets of generators, of which No. 1 and 2 have the capacity to generate 872 kVA, being its actual exploited power of 600 kW; Meanwhile groups N...
Kaydedildi:
| Yazar: | |
|---|---|
| Diğer Yazarlar: | |
| Materyal Türü: | masterThesis |
| Dil: | spa |
| Baskı/Yayın Bilgisi: |
2022
|
| Konular: | |
| Online Erişim: | http://repositorio.utc.edu.ec/handle/27000/8377 |
| Etiketler: |
Etiketle
Etiket eklenmemiş, İlk siz ekleyin!
|