Estudio y mejora de la eficiencia de generación eléctrica del grupo No. 3 de la Central Hidroeléctrica Illuchi 1 .
The Hydroelectric Power Plant called "Illuchi 1" of Empresa Eléctrica Provincial Cotopaxi S.A (ELEPCO SA), is made up of four turbines that drive 4 sets of generators, of which No. 1 and 2 have the capacity to generate 872 kVA, being its actual exploited power of 600 kW; Meanwhile groups N...
Saved in:
| Main Author: | |
|---|---|
| Other Authors: | |
| Format: | masterThesis |
| Language: | spa |
| Published: |
2022
|
| Subjects: | |
| Online Access: | http://repositorio.utc.edu.ec/handle/27000/8377 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!