Estudio y mejora de la eficiencia de generación eléctrica del grupo No. 3 de la Central Hidroeléctrica Illuchi 1 .

The Hydroelectric Power Plant called "Illuchi 1" of Empresa Eléctrica Provincial Cotopaxi S.A (ELEPCO SA), is made up of four turbines that drive 4 sets of generators, of which No. 1 and 2 have the capacity to generate 872 kVA, being its actual exploited power of 600 kW; Meanwhile groups N...

全面介绍

Saved in:
书目详细资料
主要作者: Espinel Cepeda, Carlos Alfredo (author)
其他作者: Iza Iza, Johanna Estefanía (author)
格式: masterThesis
语言:spa
出版: 2022
主题:
在线阅读:http://repositorio.utc.edu.ec/handle/27000/8377
标签: 添加标签
没有标签, 成为第一个标记此记录!