Estudio y mejora de la eficiencia de generación eléctrica del grupo No. 3 de la Central Hidroeléctrica Illuchi 1 .
The Hydroelectric Power Plant called "Illuchi 1" of Empresa Eléctrica Provincial Cotopaxi S.A (ELEPCO SA), is made up of four turbines that drive 4 sets of generators, of which No. 1 and 2 have the capacity to generate 872 kVA, being its actual exploited power of 600 kW; Meanwhile groups N...
Saved in:
主要作者: | |
---|---|
其他作者: | |
格式: | masterThesis |
语言: | spa |
出版: |
2022
|
主题: | |
在线阅读: | http://repositorio.utc.edu.ec/handle/27000/8377 |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|