Maintenance Plan Based on TPM for Turbine Recovery Machinery
The maintenance and repair of the components of hydroelectric turbines require the use of specialized equipment. To keep these teams operational, it is proposed to design a master plan in order to develop a TPM philosophy for a vertical turning lathe. This project develops five of the twelve steps e...
Gespeichert in:
| 1. Verfasser: | |
|---|---|
| Weitere Verfasser: | , |
| Format: | article |
| Sprache: | eng |
| Veröffentlicht: |
2021
|
| Online Zugang: | https://iopscience.iop.org/article/10.1088/1742-6596/1878/1/012034/pdf https://hdl.handle.net/20.500.14809/3182 |
| Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|