Maintenance Plan Based on TPM for Turbine Recovery Machinery
The maintenance and repair of the components of hydroelectric turbines require the use of specialized equipment. To keep these teams operational, it is proposed to design a master plan in order to develop a TPM philosophy for a vertical turning lathe. This project develops five of the twelve steps e...
Salvato in:
| Autore principale: | |
|---|---|
| Altri autori: | , |
| Natura: | article |
| Lingua: | eng |
| Pubblicazione: |
2021
|
| Accesso online: | https://iopscience.iop.org/article/10.1088/1742-6596/1878/1/012034/pdf https://hdl.handle.net/20.500.14809/3182 |
| Tags: |
Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!
|