Maintenance Plan Based on TPM for Turbine Recovery Machinery

The maintenance and repair of the components of hydroelectric turbines require the use of specialized equipment. To keep these teams operational, it is proposed to design a master plan in order to develop a TPM philosophy for a vertical turning lathe. This project develops five of the twelve steps e...

Full beskrivning

Sparad:
Bibliografiska uppgifter
Huvudupphovsman: Lozada-Cepeda, José (author)
Övriga upphovsmän: Lara-Calle, Rés (author), Buele, Jorge (author)
Materialtyp: article
Språk:eng
Publicerad: 2021
Länkar:https://iopscience.iop.org/article/10.1088/1742-6596/1878/1/012034/pdf
https://hdl.handle.net/20.500.14809/3182
Taggar: Lägg till en tagg
Inga taggar, Lägg till första taggen!