Maintenance Plan Based on TPM for Turbine Recovery Machinery

The maintenance and repair of the components of hydroelectric turbines require the use of specialized equipment. To keep these teams operational, it is proposed to design a master plan in order to develop a TPM philosophy for a vertical turning lathe. This project develops five of the twelve steps e...

Descripció completa

Guardat en:
Dades bibliogràfiques
Autor principal: Lozada-Cepeda, José (author)
Altres autors: Lara-Calle, Rés (author), Buele, Jorge (author)
Format: article
Idioma:eng
Publicat: 2021
Accés en línia:https://iopscience.iop.org/article/10.1088/1742-6596/1878/1/012034/pdf
https://hdl.handle.net/20.500.14809/3182
Etiquetes: Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!