Metodología para el control de costos en Procesos de menor cuantía de obras aplicando La técnica del valor ganado
In the present investigation we analyzed the methodology for the control of costs in processes of smaller quantity of works applying the technique of value gained in construction projects, where we analyzed the main aspects of the indices that influence in the control of costs applying (CVI, EAC, EA...
Enregistré dans:
| Auteur principal: | |
|---|---|
| Format: | masterThesis |
| Publié: |
2017
|
| Sujets: | |
| Accès en ligne: | http://repositorio.utmachala.edu.ec/handle/48000/10728 |
| Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|