Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo

This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...

Full description

Saved in:
Bibliographic Details
Main Author: Córdova Guerra, María Auxiliadora (author)
Format: article
Language:spa
Published: 2010
Subjects:
Online Access:http://www.dspace.espol.edu.ec/handle/123456789/13305
Tags: Add Tag
No Tags, Be the first to tag this record!