Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
-д хадгалсан:
Үндсэн зохиолч: | |
---|---|
Формат: | article |
Хэл сонгох: | spa |
Хэвлэсэн: |
2010
|
Нөхцлүүд: | |
Онлайн хандалт: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
Шошгууд: |
Шошго нэмэх
Шошго байхгүй, Энэхүү баримтыг шошголох эхний хүн болох!
|