Plan de mejora para una fábrica de plástico sobre la base de una evaluación energética y de métodos de trabajo
This work is performed at plastic processing factory located at Guayaquil. The factory’s facilities have a high electricity consumption generated by its unplanned growth. This study looks to develop a proposal to reduce energy consumption, by means of improvements for internal procedures. First, we...
Saved in:
主要作者: | |
---|---|
格式: | article |
語言: | spa |
出版: |
2010
|
主題: | |
在線閱讀: | http://www.dspace.espol.edu.ec/handle/123456789/13305 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|